A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | Purely function over form | Some upgrades are coming in the future
complex
reactor
logic
boiling
water
uranium
nuclear
uran
Comments
-
anyways the new RPS system seems to be reliable enough to add in
-
Hitachi General Electric Vernova Nuclear energy (its the same length bru)
-
oh wait no they also got their name changed
-
Hitachi-General Electric Nuclear energy is shorter
-
General Electric Vernova Hitachi Nuclear Energy or something (why is the name so long)
-
also where do i even put it
-
once i test the new RPS reliability i will add it in
-
im gonna increase the margin for DIV 3 ESF soon
-
ig they share some trip signals but bru
-
idk why RPS A2 and B1 likes to trip more compared to A1 and B2