A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | Purely function over form | Some upgrades are coming in the future
complex
reactor
logic
boiling
water
uranium
nuclear
uran
Comments
-
i might make a document on this at some point though
-
i do agree that the RMCS is a little complex though i have made a little tutorial on how to interpret the FCD and use the RMCS
-
RPS is also simple like that with 4 channels that can be independently tripped with resets
-
everything above the RMCS should just be left off/deactivate and right on/activate, T is for trip, RST is for reset
-
You need to add a manual, way too many shortcuts for the buttons, don't know what they mean.
-
how did i screw up ptct and ntct 2 separate times
-
i think ik how to fix that now
-
and i also noticed there is an insert cycle when rods are full in and withdraw cycle when rods are full out
-
withdraw block on full scram
-
upgraded FW heating so it maintains a temperature similar to what it once was pre condenser pressure change