tacooooo
tacooooo
45 / 0
1st June
4th June
6 Cores. Brand new core that packed 2 core chamber into 6, runs at 9350C. Introducing SLTW-SPNG water making, got rid of BCLN(WATR). Brand new HYGN unit that halfed water consumption. Now you could adjust fuel and coolant more freely.
peak facility fusion steam reactor

Comments

  • cindypasi
    cindypasi
    3rd June
    oh (cts)
  • tacooooo
    tacooooo
    3rd June
    cindipasi: yeah thats the RegenCoolingSystem, when the heat from heat cycle is too intense, the heat exchanger will melt (intentional design), so what you could try is: 1.let fuel system warm up longer 2.let water system run a bit before turn on heat cycle, the coolant need some time to go to vapor tower
  • Mazunga
    Mazunga
    3rd June
    love the way the curved pipes look
  • Ello again
  • cindypasi
    cindypasi
    2nd June
    and above the gel tanks
  • cindypasi
    cindypasi
    2nd June
    by the top of them i mean
  • cindypasi
    cindypasi
    2nd June
    tacooooo: it was like the glowing blue things next to the electrolisis stacks
  • jade_lynx
    jade_lynx
    2nd June
    no idea what this is but it's awesome +1
  • tacooooo
    tacooooo
    2nd June
    Some note: 1.fuel system is also RegenCoolingSystem, you must open it to counter high heat from heat cycle; 2. each button of prod. control feeds 2 cores, if it's too much or too few, alot could happen
  • tacooooo
    tacooooo
    2nd June
    Update: added the Big Red Button